27
Wed, May

CRP Subsea Secures Cable Protection Contract for Offshore Wind

Offshore Engineer
CRP Subsea, an AIS company, has recently secured a substantial contract from Seaway7 involving supplying cable protection systems for ScottishPower Renewables East Anglia TWO wind project…

Published

© Shutterstock/CRP Subsea
© Shutterstock/CRP Subsea

CRP Subsea, an AIS company, has recently secured a substantial contract from Seaway7 involving supplying cable protection systems for ScottishPower Renewables East Anglia TWO wind project, located in the North Sea.

Under this agreement, CRP Subsea will deliver 142 NjordGuard cable protection systems (CPS) to protect each end of the inter array cables on the project’s wind turbines. These systems will protect the cables from over-bending, abrasion and fatigue during installation and throughout their operational life. Three NjordGuard CPS designs will be engineered to meet the specific installation requirements for both monopile and J-tube interface types.

The NjordGuard systems will be manufactured at CRP Subsea’s purpose-built manufacturing facility in the North West of England. This facility includes a semi-automated production line that increases production capacity. Project engineering works will commence immediately, with final delivery expected in February 2027.

East Anglia TWO is part of the wider East Anglia Hub, which includes East Anglia ONE North, East Anglia TWO, and East Anglia THREE. Located in the North Sea, East Anglia TWO lies 46 km off the coast of Lowestoft and 113

Content Original Link:

Read full article from Original Source OFFSHORE ENGINEER

" target="_blank">

Read full article from Original Source OFFSHORE ENGINEER

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers